Practical resources for Plant Heads, EHS Heads, QA Heads, and CFOs running Indian manufacturing plants. Built around BRSR Core, Schedule M, IATF 16949, Factories Act, NFPA 25 and the real-world audit cycles you face. Free. India-anchored. Every download routes you back to a working solution · not a sales pitch.
Start with the ITM Readiness Checklist if your plant audit prep takes weeks. More resources rolling out fortnightly.
A 42-point readiness checklist covering inspection lifecycle, calibration cycles, statutory due-date tracking, work-order automation, and audit-evidence preparation. Mapped to NFPA 25, IS 7388, Schedule M Annex 3, IATF 16949 calibration, OISD, and Factories Act. Print, walk the plant, score yourself.
Download the checklistA Tier-1 FMCG bottler in Karnataka deployed InspectWin™ from contract signature to go-live in 15 calendar days. The narrative: how the asset master loaded, why the form pack was customised in 48 hours, what the first audit-ready PDF looked like, and how 100,000+ inspection man-hours were saved. All numbers India-anchored.
Read the caseThese resources are scheduled for the next 8 weeks. Want early access? Take the DMM Check™ · we'll route you to the resource you need first.
12-month fire-protection-system inspection calendar mapped to Indian plant operating cycles. Cross-references IS 3844 + NBC. Frequency tables for sprinklers, hydrants, fire pumps, detection, alarms. PDF + Excel.
Equipment qualification + calibration cycle template for Indian pharma plants under revised Schedule M (2024). IQ/OQ/PQ protocols, calibration master list, frequency matrix, audit-trail format.
Statutory crane and lifting-tackle inspection forms aligned to Factories Act 1948 + Maharashtra/Gujarat/Tamil Nadu state rules. Walk-around checklist, defect tagging, escalation matrix.
Excel calculator that benchmarks your OEE against Indian-plant baselines by sector and plant size. Availability × Performance × Quality with India-specific downtime cause-codes pre-loaded.
9-indicator readiness check for top-1000 listed manufacturers. Data-source mapping for energy, water, GHG, waste, packaging, workforce, safety, CSR. Assurance-ready checklist by BRSR auditor.
XLSX workbook that sizes the ROI of an Indian energy management program. State-DISCOM tariff structures (9 states), PAT cycle SEC math, ESCert position. Pre-loaded for cement, steel, textiles, chemicals.
Take the DMM Check™ · our 4-minute Digital Maturity Assessment. We'll route you to the right resource and the right Wistwin module for your plant's current state.
India work emails only. No sales call until you ask.
The form did not load. Email connect@wistwin.in or use the contact page.